Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Bank site"'
Publikováno v:
Zanco Journal of Pure and Applied Sciences, Vol 32, Iss 6 (2020)
Earthwork construction involves excavation, hauling, placing and compaction of soil, gravel, and other materials that exist on the soil surface. The soil volume varies depending whether the soil is bank, loose or compacted material. Therefore, the fi
Externí odkaz:
https://doaj.org/article/23d7f030b3c241229a47d93428af89e4
Publikováno v:
Zanco Journal of Pure and Applied Sciences, Vol 32, Iss 6 (2020)
Earthwork construction involves excavation, hauling, placing and compaction of soil, gravel, and other materials that exist on the soil surface. The soil volume varies depending whether the soil is bank, loose or compacted material. Therefore, the fi
Externí odkaz:
https://doaj.org/article/87c7a93b0ba549038c2315d116818432
Autor:
Aziz Cumhur Kocalar, Akın Eryoldaş
Publikováno v:
Cilt: 6 Sayı: 9; Volume: 6, Issue: 9 71-81
Tasarım + Kuram
Tasarım + Kuram
Taşınmaz Kültür ve Tabiat Varlıklarının korunmalarını sağlamak için, özel ve tüzel kişi mülkiyetinde ve kullanımındaki varlıklara Koruma Amaçlı İmar Planı uygulamalarında; kesin yapılaşma yasaklıların mülkiyet ile yapıla
Between 18 March and 12 April 1997, archaeological fieldwork was conducted at two sites in the Congress Street to Twenty-ninth Street segment of the Arizona Department of Transportation's Interstate 10 Corridor Improvement Project in Tucson, Ariz
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::9e3c7dcd1fec783a64f9a0c38e6608a7