Zobrazeno 1 - 10
of 21
pro vyhledávání: '"Bala Gadiyar"'
Autor:
Kevin Whaley, Tahir Tahirov, Sherine Khedr, Henry Pettinger-Harte, Svetlana Ivanova, Pierre Wood, Maye Beldongar, Bala Gadiyar, Nelson Felix
Publikováno v:
Day 2 Tue, October 04, 2022.
Shunt tube deployed Open Hole Gravel Pack (OHGP) completions have been installed in the industry for about 25 years and have become widely recognized as a very reliable sand control completion technique. Some of these shunt tube gravel pack operation
Autor:
Glenn Woiceshyn, Evgeny Anikanov, Mehmet Parlar, Ashutosh Dikshit, Aleksandar Rudic, Amrendra Kumar, Pavel Petukhov, Bala Gadiyar, Camilo Jurgensen
Publikováno v:
SPE Drilling & Completion. 35:707-713
Summary Sand control screens are installed with an internal string (wash pipe) as required which, among other functions, provides a circulation path. In long horizontal wells, running a wash pipe consumes considerable rig time and may limit the abili
Autor:
Ross Markham, Alastair Michell, David Noblett, Bernard McCartan, Septiandi Sugiarto, Tony Trung Huynh, Amrendra Kumar, Bala Gadiyar, Susheel Gupta, Aleksandar Rudic
Publikováno v:
Day 2 Wed, September 22, 2021.
A reliable single-trip openhole multizone completion can significantly lower capital expenditure (CAPEX) by reducing rig time and well count. Recent improvements in openhole packers and enhanced shunt screen technology have enabled multizone openhole
Autor:
Edward Derkach, Pradeep Pillai, Raj Mohan, Chih-Cheng Lin, Tint Htoo Aung, Valerie Lafitte, Juan-Carlos Santamaria, Jonathan Brege, Bala Gadiyar
Publikováno v:
Day 2 Wed, September 22, 2021.
For offshore wells requiring sand control, Open Hole Gravel Packing (OHGP) with or without shunted screen technology is a common completion technique. Prior to this paper, there has been no application of shunted screen OHGP in High-Pressure High-Tem
Publikováno v:
SPE Drilling & Completion. 33:324-334
Summary Two key benefits of downhole-gauge (DHG)-data analysis are identifying and minimizing the root causes of any failures that might occur during gravel packing and calibrating or verifying friction-pressure data for gravel-placement simulations.
Autor:
Ashley Lees, Maye Beldongar, Amrendra Kumar, Matthew Offenbacher, Mehmet Parlar, Nicolas Flamant, Bala Gadiyar, Daniel Agee
Publikováno v:
SPE Drilling & Completion. 33:1-11
Summary At some stage after drilling to target depth and before pumping the gravel-packing treatment or before putting the well on production, the drilling fluid is typically displaced from the wellbore. Practices in the industry vary significantly d
Autor:
Daniele Staltari, Giuseppe Ripa, Lere B. Djouli, Amrendra Kumar, Mena M. Nasrallah, Jose Urdaneta, Orlanda De Azevedo, A. I. Adeolu, Cesar Cauende, Mehmet Parlar, Dario Pellicanò, Bala Gadiyar, Bafakan A. Magloire, Yeneapre A. Aye
Publikováno v:
SPE Drilling & Completion. 32:079-085
Summary Most of the deepwater reservoirs in Angola are weakly consolidated sands, requiring sand control, and openhole gravel packing is one of the most widely used sand-control techniques for producers; Block 15/06 is no exception (Hecker et al. 200
Autor:
Elnur Ismayilov, Nicholas Moses, Bala Gadiyar, Colin Williamson, Mehmet Parlar, Kevin Alexander, Jonathan Sallis, Honore Sendel, Dave Bruce, Tertius De Kock, Maye Beldongar
Publikováno v:
Day 1 Mon, September 30, 2019.
The Kraken field development was planned and executed through several batch drilling and completion phases to allow a review of each phase and incorporate the lessons learned in the next phase. All producers were drilled with an oil-based reservoir d
Publikováno v:
SPE Drilling & Completion. 31:004-015
Summary Openhole sand-control technique selection has been a topic of interest since the late 1990s and was discussed most comprehensively in SPE 85504 (Price-Smith et al. 2003), which proposed guidelines for selection between standalone screens (SAS
Autor:
Matthew Offenbacher, Nicolas Flamant, Bala Gadiyar, Amrendra Kumar, Daniel Agee, Maye Beldongar, A. Lees, Mehmet Parlar
Publikováno v:
Day 3 Wed, March 08, 2017.
At some stage after drilling to target depth and before pumping the gravel packing treatment or before putting the well on production, the drilling fluid is typically displaced from the wellbore. Practices in the industry vary significantly depending