Zobrazeno 1 - 10
of 157
pro vyhledávání: '"Bahman Naderi"'
Publikováno v:
Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī, Vol 19, Iss 60, Pp 237-284 (2021)
In the real world, firms with hybrid flow-shop manufacturing environment generally facethe human resource constraint, salary cost increasment and efforts to make better use oflabor, in addition to machine constraint. Given the limitations of these re
Externí odkaz:
https://doaj.org/article/4ffd7bf78f9649e59485c14b5c367d0d
Publikováno v:
Discrete Dynamics in Nature and Society, Vol 2022 (2022)
Nowadays, due to growing development and competitiveness in global markets of products, companies are forced to make significant efforts for supply procurement, production, and goods distribution in order to survive in the market and be able to respo
Externí odkaz:
https://doaj.org/article/ee155e6038ce4177bbf847cb23dfac45
Publikováno v:
Journal of Optimization in Industrial Engineering, Vol 12, Iss 1, Pp 103-117 (2019)
This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be
Externí odkaz:
https://doaj.org/article/c7837c124efe458886a4105267d773ae
Publikováno v:
چشمانداز مدیریت صنعتی, Vol 8, Iss 1, Pp 93-111 (2018)
Assembly flowshop with setup times is one of the newset production scheduling problems. In this problem, parts in the first stage that is a flow shop system are produced. Then, in the second stage, they are assembled. The objective is to sequence the
Externí odkaz:
https://doaj.org/article/6314a8c048e14c0d93e73c4302d7c305
Autor:
Mehdi Yazdani, Bahman Naderi
Publikováno v:
Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī, Vol 15, Iss 47, Pp 151-168 (2017)
In the scheduling problems, it is commonly assumed that processing times are fixed and known. In the literature of project scheduling emphasizes that the time of each activity/operation can be multi-mode and by assigning more resources, the activity
Externí odkaz:
https://doaj.org/article/7d97634b04734753b8e1202fe914e9f3
Publikováno v:
International Journal of Supply and Operations Management, Vol 4, Iss 1, Pp 53-62 (2017)
In this paper, we consider the capacitated single allocation p-hub median problem generalized with fixed costs of opening facilities. The quadratic mathematical formulation of this problem is first adapted and then linearized. The typical approaches
Externí odkaz:
https://doaj.org/article/c29074331056470e8933b0338fed3ceb
Publikováno v:
Tehnički Vjesnik, Vol 24, Iss Supplement 2, Pp 241-247 (2017)
This paper deals with the problem of course scheduling where we have a set of courses, lecturers and classrooms. Courses are assigned and scheduled in such a way that the total preference is maximized. We develop the mathematical model of the problem
Externí odkaz:
https://doaj.org/article/b6a99389cff7462cabd86ad4b4821e1f
Autor:
Mehdi Yazdani, Bahman Naderi
Publikováno v:
Journal of Optimization in Industrial Engineering, Vol 10, Iss 21, Pp 59-66 (2016)
Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This pape
Externí odkaz:
https://doaj.org/article/c4354d8747d242ee85a3267d4e6142d7
Autor:
Bahman Naderi
Publikováno v:
Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī, Vol 14, Iss 43, Pp 53-77 (2016)
In this paper hybrid flowshop scheduling problem where some jobs, not all, have to follow no-wait restriction (that is, the operations of that job must be processed with no stop) is examined. In the literature, all papers assume that all jobs of the
Externí odkaz:
https://doaj.org/article/32e3ed2a2d924dd5bd019a01927adab7
Publikováno v:
International Journal of Supply and Operations Management, Vol 3, Iss 1, Pp 1112-1125 (2016)
Nowadays Business intelligence (BI) tools provide optimal decision making, analyzing, controlling and monitoring of operations in enterprise systems like enterprise resource planning (ERP) and mainly refer to strong decision making methods used in on
Externí odkaz:
https://doaj.org/article/1edfdce849854bd79ecc1f55011521b4