Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Azemeraw Tadesse Mengistu"'
Publikováno v:
Journal of Engineering, Project, and Production Management, Vol 8, Iss 1, Pp 40-46 (2018)
Downtime is significant among the role players of production loss and low productivity. The case company is currently experiencing high downtimes and it is producing less than 48% of its capacity. This case study aims at reducing the high downtime th
Externí odkaz:
https://doaj.org/article/d42c931d542c4920b5f0af82d052c621
Publikováno v:
Measuring Business Excellence. 27:54-70
Purpose The lack of suitable indicators tailored to manufacturing industries’ needs, particularly to small and medium enterprises (SMEs), has been the major challenge to measure and manage industrial sustainability performance. This paper aims to e
Publikováno v:
Environment, Development and Sustainability. 25:1979-2005
PurposeThis paper aims to identify and empirically analyze useful and applicable metrics for measuring and managing the sustainability performance of small and medium-sized enterprises (SMEs).Design/methodology/approachTo achieve the objective of the
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::3bd6b6f76ca76e65c271cf22c48233e6
https://hdl.handle.net/11577/3467529
https://hdl.handle.net/11577/3467529
Publikováno v:
Sustainability, Vol 13, Iss 5472, p 5472 (2021)
Sustainability
Volume 13
Issue 10
Sustainability
Volume 13
Issue 10
As small and medium enterprises (SMEs) have limited resources, they need a manageable number of indicators that are simple and easy to use for measuring sustainability performance. However, the lack of suitable indicators tailored to industry needs,
Publikováno v:
International Journal of Management Concepts and Philosophy. 1:1
Publikováno v:
Journal of Engineering, Project, and Production Management, Vol 8, Iss 1, Pp 40-46 (2018)
Downtime is significant among the role players of production loss and low productivity. The case company is currently experiencing high downtimes and it is producing less than 48% of its capacity. This case study aims at reducing the high downtime th