Zobrazeno 1 - 10
of 19
pro vyhledávání: '"Ashutosh Dikshit"'
Autor:
Ashutosh Dikshit, Vivek Agnihotri, Mike Plooy, Amrendra Kumar, Seymur Gurbanov, Valeria Erives, Abhinandan Tripathi
Publikováno v:
SPE Drilling & Completion. 37:169-180
Summary Integrating a flow control sliding sleeve into a sand screen can provide multiple advantages to the user in controlling the production inflow, but it comes with an increased completion cost as well as an increase in the number of intervention
Autor:
Balkrishna Gadiyar, Mehmet Parlar, Glenn Woiceshyn, Michael Langlais, Amrendra Kumar, Ashutosh Dikshit
Publikováno v:
SPE Drilling & Completion. 36:445-458
Summary For offshore wells requiring sand control, it is beneficial to extend the openhole length to access more reserves with a reduced well count. In challenging environments (e.g., low fracture pressure, highly unconsolidated sand), gravel packing
Publikováno v:
SPE Drilling & Completion. 36:459-472
Summary Interest is high in a method to reliably run single-trip completions without involving complex/expensive technologies (Robertson et al. 2019). The reward for such a design would be reduced rig time, safety risks, and completion costs. As desc
Publikováno v:
SPE Drilling & Completion. 36:413-426
SummaryProppant flowback from hydraulic fracturing is widespread and costly due to erosion and/or blockage of producing hydrocarbons as proppant may accumulate downhole. Several strategies have been applied to avoid or minimize proppant flowback, suc
Autor:
Gocha G Chochua, Amrendra Kumar, Sule F. Gurses, Aleksandar Rudic, Ashutosh Dikshit, Nityanand Sinha
Publikováno v:
Day 3 Wed, May 04, 2022.
The durability of sand screen completions is essential to longer well life, especially for high rate wells with sand screen erosion concerns. An excessive fluid flow enters the conventional screens near the heel or high permeability/fracture zones, c
Autor:
Glenn Woiceshyn, Evgeny Anikanov, Mehmet Parlar, Ashutosh Dikshit, Aleksandar Rudic, Amrendra Kumar, Pavel Petukhov, Bala Gadiyar, Camilo Jurgensen
Publikováno v:
SPE Drilling & Completion. 35:707-713
Summary Sand control screens are installed with an internal string (wash pipe) as required which, among other functions, provides a circulation path. In long horizontal wells, running a wash pipe consumes considerable rig time and may limit the abili
Publikováno v:
SPE Drilling & Completion. 35:414-427
Summary To prevent or minimize problems associated with water coning in horizontal oil producers, inflow control devices (ICDs) are installed along the wellbore to better equalize the toe-to-heel flux. Nozzle-based ICDs are popular because they are e
Autor:
Salvador Duran, Mike Plooy, Ashutosh Dikshit, Amrendra Kumar, Ehab Abo Deeb, Gocha Chochua, Sudhakar Khade, Abhinandan Tripathi, Jose Trevino, Wesley Atkinson
Publikováno v:
Day 1 Mon, November 15, 2021.
Meeting the production demand in today's market without sacrificing performance of the artificial lift method is critical. Aggressive flowback procedures lead to solids production and unplanned electric submersible pump (ESP) shutdowns because of sol
Autor:
Vivek Agnihotri, Ashutosh Dikshit, Valeria Erives, Seymur Gurbanov, Mike Plooy, Amrendra Kumar, Abhinandan Tripathi
Publikováno v:
Day 2 Wed, September 22, 2021.
Integrating a flow control sliding sleeve into a sand screen can provide multiple advantages to the user in controlling the production inflow. Although it does come with an increased completion cost as well as the number of interventions required whe
Autor:
Ezinne Amanda Nnebocha, Chidi Henry Ugboaja, Tunji Olukayode, Aleksander Rudic, Omagbemi George Kakayor, Adetayo Odutayo, Amrendra Kumar, Olawale Oguntayo, Chukwuma Onwuchekwa, Akinola Akinbola, Richmond Nduka Nwaokwu, Temitope Ilusemeti, Akanimoh Bassey Nkanga, Oluwatoyin Olagunju, Ashutosh Dikshit
Publikováno v:
Day 3 Wed, August 18, 2021.
Discovered in 1964, the Beta Field in the Niger Delta sedimentary basin consists of 25 stacked hydrocarbon-bearing reservoirs located between 5,500 and 12,000 feet true vertical depth subsea (TVDSS). A total of 26 wells have been drilled in the field