Zobrazeno 1 - 10
of 12
pro vyhledávání: '"Ashkan Mozdgir"'
Autor:
Hadi Mokhtari, Ashkan Mozdgir
Publikováno v:
International Journal of Industrial Engineering and Production Research, Vol 26, Iss 2, Pp 105-117 (2015)
Assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. In many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line
Externí odkaz:
https://doaj.org/article/30373a29c5514f1f83753925386dc66f
Publikováno v:
Voprosy ginekologii, akušerstva i perinatologii. 20:12-18
Introduction. Haematological parameters such as haemoglobin, haematocrit and red blood cells are very important in determining health and physiological status of a human. It is perceived that the haematological parameters level can change depending o
Publikováno v:
Current stem cell researchtherapy. 16(4)
COVID-19 pandemic is a global health crisis of the 21st Century. There are currently no approved vaccines and no particular anti-viral treatment for coronavirus disease. As COVID-19 has a broad range of illnesses, it is necessary to find a safe and e
Autor:
Rasoul Shafaei, Ashkan Mozdgir
Publikováno v:
Scientia Iranica.
In this research the master surgical scheduling (MSS) problem at the tactical level of hospital planning and scheduling is studied. Before constructing the MSS, a strategic level problem, i.e. case mix planning problem (CMPP), shall be solved to allo
Publikováno v:
Computers & Operations Research. 44:52-65
This paper addresses the two-stage assembly flow-shop scheduling problem with non-identical assembly machines at the second stage to minimize a sum of holding and delay costs. Although there are more than one assembly machine in many manufacturing sy
Publikováno v:
International Journal of Production Research. 51:3625-3642
In this paper, we address the two stage assembly flow-shop problem with multiple non-identical assembly machines in stage two to minimise weighted sum of makespan and mean completion time. Also, sequence dependent setup times are considered for the f
Publikováno v:
Mathematical and Computer Modelling. 57:137-151
An assembly line is a flow-oriented production system in which the productive units performing the operations, referred to as stations, are aligned in a serial manner. The simple assembly line balancing problem (SALBP) is a fundamental version of the
Publikováno v:
International Journal of Production Research. 50:5906-5925
In classical scheduling problems, it is often assumed that the machines are available during the whole planning horizon, while in realistic environments, machines need to be maintained and therefore may become unavailable within production periods. H
Publikováno v:
The International Journal of Advanced Manufacturing Technology. 50:811-822
This paper develops a hybrid approach for stochastic time–cost trade-off problem (STCTP) in PERT networks of project management, where activities are subjected to linear cost functions. The main objective of proposed approach is to improve the proj
Publikováno v:
2009 International Conference on Computers & Industrial Engineering.
In this paper, we address the two-stage assembly flowshop scheduling problem which has m parallel machines at the first stage and an assembly machine at the second stage with a weighted sum of makespan and mean completion time criteria, known as bicr