This paper covers an optimization study at Aramco's Khurais processing facility to maximize NGL yield and minimize H2S content through HYSYS simulation. Model validation and identifying the confidence level of the model (prior optimization) approach
Publikováno v:
Day 4 Thu, November 03, 2022.
This paper covers an energy optimization study conducted by Saudi Aramco to maximize energy efficiency and minimize GHG emissions via onion peeling method to analyze the system from outside to inside by segregating the system to three essential layer
Publikováno v:
Day 2 Tue, November 01, 2022.
This paper covers and evaluates a retrofit work for desalting trains grids in Saudi Aramco Khurais facility to accommodate water cut increases due to field maturity. The main objective of this retrofit work is to accommodate the increase in water cut
Khurais HP Gas Compressor Swing Line Control Logic Modification Through Dynamic Simulation Modelling
Publikováno v:
Day 2 Tue, November 16, 2021.
Khurais central processing Facility is a hydrocarbon plant consists of 5 GOSPs with a stabilizer (i.e oil train), 3 gas plants and power plant with their associated utilities. Each oil train has one HP gas compressor to send the gas from oil trains t
The new era of Big Data (BD) is influencing the chemical industries tremendously, providing several opportunities to reshape the way they operate and for shifting towards smart manufacturing. Given the availability of free software, and the large amo
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::922b5ad6348f3034df2d1bd8a82debc2
https://doi.org/10.22541/au.162568750.07023402/v1
https://doi.org/10.22541/au.162568750.07023402/v1
Autor:
Ashiff Khan, Ahmad M. Saif
Publikováno v:
All Days.
Khurais Central Processing Facility Overview The geographical location of the Khurais Central Processing Facility (KhCPF) is around 250 km southwest of Dhahran, where Saudi Aramco’s headquarters are located. KhCPF were commissioned and started in M
Autor:
Ashiff Khan, Mazen Al-Juaid, Franklin Randall, Awwad Al-Doosary, Mustafa Al-Jubran, Sabhan Al-Shammary, Mohammed Al-Muaibed
Publikováno v:
All Days.
The Khurais Central Processing Facility (KhCPF) includes four salt water disposal (SWD) systems distributed among four oil trains. Each SWD system is comprised of one water-oil separator (WOSEP), three 33% salt water disposal pumps, and necessary pip