Zobrazeno 1 - 5
of 5
pro vyhledávání: '"Ashar, AR"'
A Boiler Feed Pump Speed Control to Reduce Its Own Power Consumption According to Pump Affinity Law.
Publikováno v:
IOP Conference Series: Earth & Environmental Science; 5/19/2023, Vol. 1209 Issue 1, p1-6, 6p
Publikováno v:
Jurnal Teknologi Elekterika. 19:130
PLTGU Sengkang which is operated by PT. CEPA Sengkang with a total capacity of 315 MW. One of the important components in the PLTGU system is a generator. In a generator there are many problems that arise, including generator efficiency problems. The
Publikováno v:
Jurnal Teknologi Elekterika. 4:36
PLTB (Pembangkit Listrik Tenaga Bayu) yang terletak di Kabupaten Sidrap dan Jeneponto merupakan sumber energi terbarukan yang pertama terinterkoneksi di sistem Sulselbar dengan kapasitas masing – masing 70 MW dan 62.5 MW. Penambahan pembangkit dala
Publikováno v:
Proceedings of the 7th Engineering International Conference on Education, Concept and Application on Green Technology.
Autor:
A Nirwan Noor, Ashar Ar
Publikováno v:
Jurnal Teknologi Elekterika. 13:129
Dunia sedang dalam krisis energi untuk memenuhi kebutuhan listrik yang kian meningkat. Sebagian besar komsumsi energi listrik digunakan untuk menghidupkan motor-motor listrik. Oleh karena itu, kebutuhan akan motor-motor listrik yang memiliki performa