Zobrazeno 1 - 10
of 14
pro vyhledávání: '"Apache Junction, AZ"'
Autor:
Laurila, Erick, Hudson, Lesley
The Federal Highway Administration (FHWA) and the Arizona Department of Transportation (ADOT) are planning a spot improvement and pavement preservation project along State Route (SR) 88, also known as the Apache Trail between Milepost (MP) 203.40 and
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::50dd010bfc96732ce8506b23aff297e6
Autor:
Sulgi Lotze
Under contract with the Arizona Department of Transportation (ADOT), HDR Engineering, Inc. (HDR), has been tasked with the preliminary planning and predesign of a north-south highway corridor in Pinal County, Arizona (Federal Highway Administration P
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::129ac5ad7b24816b6a92c136b3b81575
Autor:
Goldstein, Beau J.
On October 20, 2004, Transcon Infrastructure, Inc. (Transcon) conducted a Class III (Intensive Field Inventory) cultural resources survey of approximately 28 acres for the proposed construction of an electrical distribution substation and transmissio
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::41e5b77cc44546ce39c31b31c758a6ff
Autor:
Walth, Cherie K.
Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Proj
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::fe1fdfcffb693429d1f20ed483a3a75b
Autor:
Harmon, Alaina
Between April 15 and June 14, 1993, Archaeological Research Services, Inc. performed a cultural resources survey of State Route 88 (the Apache Trail). The right-of-way varies from 66 to 200 feet, but construction as-builts were not available. Therefo
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::8820d970c53d126e078bcd16f816e471
Autor:
Bilsbarrow, Matthew H.
Between June 12 and 15, 1995, Archaeological Research Services, Inc. performed a cultural resources survey within the 300-to-400-foot (92-122 m) wide right-of-way along U.S. 60/70/80/89, between milepost 198.4 in Apache Junction and milepost 212.0 in
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::8afa7cf1876cb4815cd231df701330be
This report describes the results of a cultural resource mitigation project (Project No. R-1760) undertaken on the proposed Spurlock Substation property (3.23 acres) by Regional Environmental Consultants (RECON) for Salt River Project (SRP). A portio
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::c5ebd4f86e83325b98ef486b464525dc
Autor:
Cable, John, Ritz, Frank
On December 14, 1987, Regional Environmental Consultants (RECON) conducted archaeological surveys of two proposed Salt River Project substation sites, the Seaton/Farnsworth and Spurlock Substations. The Seaton/Farnsworth site is located along Souther
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::e4d1f0fe9d2914b2eac5f8dc1729c563
Autor:
Stein, Pat H.
In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey a
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::eea2973c98e0c5094050e90ba36b025f
Autor:
Davidson, Howard M.
On February 10, 1975, personnel from the Museum of Northern Arizona conducted archaeological investigations of five proposed drilling locations for the Salt River Project Coronado Transmission Line Project. The surveys for this project took place on
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::4bd1db352104ad77dc7d644ac8cad67f