Zobrazeno 1 - 10
of 694
pro vyhledávání: '"Apache Junction, AZ"'
Publikováno v:
Kiplinger Personal Finance. Aug2024, Vol. 78 Issue 8, p50-58. 9p. 10 Color Photographs.
Autor:
Laurila, Erick, Hudson, Lesley
The Federal Highway Administration (FHWA) and the Arizona Department of Transportation (ADOT) are planning a spot improvement and pavement preservation project along State Route (SR) 88, also known as the Apache Trail between Milepost (MP) 203.40 and
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::50dd010bfc96732ce8506b23aff297e6
Autor:
PR Newswire
Publikováno v:
PR Newswire US. 11/16/2011.
Autor:
El Haj, Youssef1 (AUTHOR) youssef.elhaj@ontariotechu.net, Sood, Vijay K.1 (AUTHOR) vijay.sood@ontariotechu.ca
Publikováno v:
Energies (19961073). Jul2024, Vol. 17 Issue 14, p3385. 33p.
Autor:
Sulgi Lotze
Under contract with the Arizona Department of Transportation (ADOT), HDR Engineering, Inc. (HDR), has been tasked with the preliminary planning and predesign of a north-south highway corridor in Pinal County, Arizona (Federal Highway Administration P
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::129ac5ad7b24816b6a92c136b3b81575
Autor:
Goldstein, Beau J.
On October 20, 2004, Transcon Infrastructure, Inc. (Transcon) conducted a Class III (Intensive Field Inventory) cultural resources survey of approximately 28 acres for the proposed construction of an electrical distribution substation and transmissio
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::41e5b77cc44546ce39c31b31c758a6ff
Autor:
Walth, Cherie K.
Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Proj
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::fe1fdfcffb693429d1f20ed483a3a75b
Autor:
Harmon, Alaina
Between April 15 and June 14, 1993, Archaeological Research Services, Inc. performed a cultural resources survey of State Route 88 (the Apache Trail). The right-of-way varies from 66 to 200 feet, but construction as-builts were not available. Therefo
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::8820d970c53d126e078bcd16f816e471
Autor:
Bilsbarrow, Matthew H.
Between June 12 and 15, 1995, Archaeological Research Services, Inc. performed a cultural resources survey within the 300-to-400-foot (92-122 m) wide right-of-way along U.S. 60/70/80/89, between milepost 198.4 in Apache Junction and milepost 212.0 in
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::8afa7cf1876cb4815cd231df701330be
Autor:
PR Newswire
Publikováno v:
PR Newswire US. 08/17/2023.