Zobrazeno 1 - 5
of 5
pro vyhledávání: '"Anjul Tomar"'
Publikováno v:
Journal of Materials and Engineering Structures, Vol 6, Iss 4, Pp 583-592 (2019)
High strength concrete (HSC) define as the concrete that meets a unique mixture of performance uniformity requirements that cannot be reached routinely using conventional constituents and regular mixing, placing, and curing events. The modeling of su
Externí odkaz:
https://doaj.org/article/08b0f81e015a4a3fa52dc4a101093c97
Autor:
Anjul Tomar, V. K. Bansal
Publikováno v:
Arabian Journal for Science and Engineering. 45:3983-3997
Unique scheduling challenges are presented by the construction projects having repetitive activities. The present study deals with the development of a scheduling tool to meet the requirements of projects having repetitive activities. Generally, the
Autor:
Sudhir Kapgate, Anjul Tomar
Publikováno v:
IOP Conference Series: Earth and Environmental Science. 1084:012029
Thecemententerprisebetheessentialhotspotintendedfornaturalcontamination because it admissions a tremendous measure of energy during the creationas well as deliveries a ton of CO2which adds to an unnatural weather change. Reducethese impacts, concrete
Autor:
V. K. Bansal, Anjul Tomar
Publikováno v:
International Journal of Construction Management. 22:1104-1119
Surroundings is a major factor that affects scheduling of a repetitive construction project. But, both the past experience of planner and the commercially available tools are limited to take the ef...
Autor:
V. K. Bansal, Anjul Tomar
Publikováno v:
Asian Journal of Civil Engineering. 20:549-562
Critical path method (CPM) is the widely used technique for scheduling of non-repetitive construction projects, on the other hand, line of balance (LOB) is used for scheduling of repetitive construction projects. There may exist repetitive and non-re