Zobrazeno 1 - 10
of 21
pro vyhledávání: '"Andrey A. Troshko"'
Autor:
Akihiro Kohata, Thomas Willingham, Tareq AlDaghar, Amit Kumar, Zhihua Wang, Alunood Alsowaidi, Andrey A. Troshko, David Fischer, Jorge L. Pacheco
Publikováno v:
Day 3 Wed, January 15, 2020.
Water-alternating-gas-injection (WAGI) pilot wells are planned to be drilled in a giant offshore oil field in Abu Dhabi. To minimize pilot well cost, carbon steel is considered as one of the potential materials. Planned WAGI wells will have extremely
Autor:
Matthew J. Tenny, Christian S. Mayer, Andrey A. Troshko, Jason Y. Wang, Federico G. Gallo, M. Sami
Publikováno v:
Day 3 Thu, March 28, 2019.
When producing hydrocarbons from an oil well, managing erosion of both surface and subsurface components caused by solids in the flow stream is critical to maintaining operations integrity in both land and offshore assets. Although component lifetime
Autor:
Timothy Morrow, Siamack A. Shirazi, Caroline Schell, Tariq Al-Daghar, Kenneth P. Roberts, Michael W. Keller, Andrey A. Troshko
Publikováno v:
Day 1 Mon, November 12, 2018.
The long-term development plan for a giant oil field offshore Abu Dhabi calls for new extended reach wells drilled from artificial islands. The existing wells in this field have historically suffered from inorganic sulfate-based scale deposition in t
Autor:
P.. Seitinger, Christian S. Mayer, D. E. Helgestad, D. F. Rosenbaum, T. H. Lopez, Federico G. Gallo, Jason Y. Wang, Andrey A. Troshko
Publikováno v:
Day 2 Tue, October 10, 2017.
Effectively managing risks to achieve a safe and reliable start-up is a crucial step before diverting a well to production facilities. This paper describes a successful offshore well start-up in Norway's Sigyn field, assisted and guided by advanced w
Autor:
Matthew S. Jackson, Graham Edmonstone, Andrey A. Troshko, Curtis Willard Kofoed, Christian S. Mayer
Publikováno v:
Day 3 Wed, November 09, 2016.
Following a premature failure of an ICD liner in a pilot ERD well in a giant Middle East offshore oilfield, a thorough investigation, summarised in a prior paper1, 2, was undertaken to understand the failure mechanism. The conclusion of the failure a
Publikováno v:
Day 2 Tue, November 08, 2016.
A new generation of sophisticated wells are to be drilled in a giant offshore field in Abu Dhabi. These extended reach wells will reach and produce remote areas of the field from artificially built islands. The first maximum reservoir contact (MRC) p
Autor:
Andrey A. Troshko, Franz Zdravistch
Publikováno v:
Chemical Engineering Science. 64:892-903
Industrial bubble column reactors for Fischer–Tropsch (FT) synthesis include complex hydrodynamic, chemical and thermal interaction of three material phases: a population of gas bubbles of different sizes, a liquid phase and solid catalyst particle
Autor:
Andrey A. Troshko, Alfred M. Jackson, Graham Edmonstone, Curtis Willard Kofoed, Chris E. Shuchart
Publikováno v:
Day 1 Mon, November 09, 2015.
The recent industry development of drilling ERD wells with horizontal laterals in the reservoir of 10,000 ft. or more has led to a greater use of passive flow control devices and swell packers to achieve the desired inflow or outflow profiles. Anothe
Autor:
Saleh Abdul Samad, Curtis Willard Kofoed, Graham Edmonstone, Ghassan Abdouche, Sofiane Bachar, Christian S. Mayer, Adriana Carolina Alvarez, Alfred M. Jackson, Chris E. Shuchart, Andrey A. Troshko
Publikováno v:
Day 4 Thu, November 13, 2014.
For the last 30 years, wells in the field have been suffering from medium to high corrosion rates in both near surface and downhole components. Remedial measures had been implemented in order to restore Well Integrity with different techniques. Corre
Autor:
Shardul Parihar, Saad Mumtaz, Ghassan Abdouche, Curtis Willard Kofoed, Chris E. Shuchart, Graham Edmonstone, Alfred M. Jackson, Andrey A. Troshko, Adriana Carolina Alvarez, Christian S. Mayer
Publikováno v:
Day 3 Wed, November 12, 2014.
As part of the Islands Project which involves the use of 4 artificial islands to drill & complete over 300 ERD wells in a giant offshore oilfield, several completion designs have been piloted to test & monitor their suitability for the brownfield dev