Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Andrei Casali"'
Autor:
Eleanor Bell, Johnny Bårdsen, Terje Sporstøl, Kjell Tore Nesvik, Stefan Dinger, Azwan Hadi Keong, Andrei Casali, Frank Lind, Bjørn Engvald Staveland Nilsen
Publikováno v:
Day 4 Thu, October 21, 2021.
Coiled tubing (CT) operations in the Norwegian continental shelf (NCS) often require a long and large-outside-diameter pipe due to big diameter completions, deep wells, and the need for high annular velocity during fluid circulation. However, getting
Autor:
Mark Hofacker, Azwan Hadi Keong, Anders Holmgaard Hansen, Jesus Campos, Jordi Segura, Inge Fossdal, Sindre Vingen, Andrei Casali, Ted Brueren
Publikováno v:
Day 2 Tue, March 23, 2021.
On the Norwegian continental shelf (NCS), coiled tubing (CT) cleanout requires small bites and frequent wiper trips to the surface due to potential sand bedding in a large and deviated completion. A real-time CT downhole measurement system is used to
Publikováno v:
Day 3 Wed, November 16, 2016.
The limitations to performing rigless interventions in small platforms and safety concerns of performing multiple heavy lifts to the platform have motivated different locations worldwide to find solutions for accomplishing their objectives by utilizi