Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Amir Galaby"'
Publikováno v:
Day 3 Wed, November 02, 2022.
Drilling and cementing through surface sections with highly active shallow gas formations is seriously challenging. In order to save employees lives and maintain a safe working environment, wells are designed with careful consideration of mud weight,
The current research addressed the topic of social resilience and the response to the COVID-19 pandemic in both Egypt and the United Arab Emirates on a comparative basis. The research formulated a group of theatrical issues, put several goals and que
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::c34a65bda7c92d63341b0be898ffc38a
https://doi.org/10.4018/978-1-7998-8973-1.ch004
https://doi.org/10.4018/978-1-7998-8973-1.ch004
Publikováno v:
International Petroleum Technology Conference.
Autor:
Amir Galaby, Melvin John, Ozgur Cengiz, Daria Ponomareva, Miguel Angel Cardenas, Mustafa Al-Rubaye, Maksim Antonov
Publikováno v:
International Petroleum Technology Conference.
Obtaining a good cement bond is a continuous challenge, especially if the well being cemented is a high-pressure exploration gas well, and it is one of the very few gas wells drilled in the country. Poor adherence to the casing and the formation, cha
Autor:
Ara Krikor, Miguel Angel Cardenas, Husnu Ozgur Cengiz, Martin Sanderson, Amir Galaby, Birgitte Ruud Kosberg
Publikováno v:
Day 1 Mon, October 21, 2019.
As the demand for natural gas continuously increases to meet electricity production needs, more alternative natural gas sources are usually required to cope with the increased demand in the summer months. In South Iraq, this situation is the main dri
Autor:
Ahmed Salaheldin, Amir Galaby, Cherif Hammoutene, Amir A. ElKawass, Muhammad Qasim Qazi, Chandresh Verma, Tarek ElDeeb, Abdulqawi Al Fakih, Ahmed Osman, Nadem Mehrdad
Publikováno v:
Day 4 Thu, March 09, 2017.
While ERD multi-lateral wells in a large Middle East field are typically drilled in six to seven well bore sections, drilling the 8.5-in curve and the 6.125-in lateral sections represents more than 50 % of the total time spent drilling the well. Chal