Kamyab Aghajamali, Ala Nekouvaght Tak, Hosein Taghaddos, Ali Mousaei, Saeed Behzadipour, Ulrich Hermann
Publikováno v:
Journal of Construction Engineering and Management. 149
Publikováno v:
Journal of Construction Engineering and Management. 147
Planning lift activities of mobile cranes for a modular project can raise productivity and improve safety. An optimized lift plan is essential for multiple lifts due to high rental cost of ...
Publikováno v:
Journal of Construction Engineering and Management. 147
Improper planning and management of heavy lifts is a major cause of cost overruns, delays, and, more importantly, safety incidents in industrial megaprojects. Automated lift planning is wid...
Publikováno v:
Automation in Construction. 128:103766
Heavy industrial construction, particularly when modularization is adopted, requires thorough heavy-lift studies to manage the extensive use of mobile cranes in congested and dynamic site layouts. This study introduces an integrated 4D crane simulati
Publikováno v:
Automation in Construction. 122:103508
Lift path planning is a significant subtask in constructability analysis, sequencing, and scheduling of congested industrial modular projects, impacting project cost, and safety. Although intuitive lift planning is still prevalent among the practitio
Publikováno v:
Automation in Construction. 121:103447
Nowadays, the use of heavy mobile cranes in on-site construction of industrial projects has become inevitable. Due to the high rental cost of such cranes, an optimized plan is essential for the multiple crane lifts. This plan reduces the operating co
Publikováno v:
Automation in Construction. 114:103175
Modularization is becoming more popular in industrial construction to enhance various project management aspects, including time, cost, safety, quality, and productivity. Although many studies have highlighted the differences between modular and conv