Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Alexandre David Felisberto"'
Publikováno v:
PARC: Pesquisa em Arquitetura e Construção, Vol 12, Iss 00 (2021)
The cost estimation of public sector projects in Brazil must observe the prevailing legislative framework to reduce the likelihood of under-and-over pricing of construction works and potential corruption. Therefore, initial estimates for projects mus
Externí odkaz:
https://doaj.org/article/90f25e4e91fb45db811f830679292ed3
Publikováno v:
Journal of Construction Engineering and Management. 146
Research examining underpricing in social infrastructure projects has been limited (e.g., schools), yet this is a reality that confronts many governments worldwide. The upshot of underprici...
Publikováno v:
PARC: Pesquisa em Arquitetura e Construção, Vol 12, Iss 00 (2021)
PARC Pesquisa em Arquitetura e Construção; Vol. 12 (2021): Continous publication; e021004
PARC Pesquisa em Arquitetura e Construção; Vol. 12 (2021): Publicação contínua; e021004
PARC Pesquisa em Arquitetura e Construção; v. 12 (2021): Publicação contínua; e021004
PARC (Campinas)
Universidade Estadual de Campinas (UNICAMP)
instacron:UNICAMP
PARC Pesquisa em Arquitetura e Construção; Vol. 12 (2021): Continous publication; e021004
PARC Pesquisa em Arquitetura e Construção; Vol. 12 (2021): Publicação contínua; e021004
PARC Pesquisa em Arquitetura e Construção; v. 12 (2021): Publicação contínua; e021004
PARC (Campinas)
Universidade Estadual de Campinas (UNICAMP)
instacron:UNICAMP
The cost estimation of public sector projects in Brazil must observe the prevailing legislative framework to reduce the likelihood of under-and-over pricing of construction works and potential corruption. Therefore, initial estimates for projects mus