Zobrazeno 1 - 10
of 27
pro vyhledávání: '"Al-Kulabi A"'
Publikováno v:
Open Engineering, Vol 12, Iss 1, Pp 702-715 (2022)
In the construction industry, time overrun in construction projects has become a global phenomenon. In Iraq, this problem is very considerable where a high percentage of projects are completed behind schedule, causing a large negative impact on socie
Externí odkaz:
https://doaj.org/article/4c416e9444ae4ca1a55c8ce5c33be81e
Publikováno v:
Open Engineering, Vol 12, Iss 1, Pp 111-119 (2022)
Three scaled concrete slabs were cast and tested till failure under drop-weight impacts and static loads, sequentially. Two of the three slabs contained 0.5% steel fiber while the third slab was constructed by using only steel bar reinforcement (i.e.
Externí odkaz:
https://doaj.org/article/fb7a7117880b4f8a9a17808f67c2e600
Publikováno v:
Mağallaẗ Al-kūfaẗ Al-handasiyyaẗ, Vol 9, Iss 1, Pp 60-76 (2018)
A number of studies have been conducted to specify the most effecting factors on the success of projects. Those studies titled the most influencing factor, which is the bid selection criterion. By this criterion, the most qualified bidder/contractor
Externí odkaz:
https://doaj.org/article/35d35170390e4f8683e07c7ae6dca97b
Autor:
Ahmed, AL. kulabi, Avetisyan, Hakob
Publikováno v:
In Procedia Engineering 2016 145:1066-1073
Publikováno v:
Mathematical Modelling of Engineering Problems. 9:343-350
Globally, construction industry plays a key role in development of an economy of any country. On the other side, construction projects suffer extensive delays and cost overruns exceeding by that the budgeted money and the estimated time. Therefore, a
Autor:
Ali Khazaal Jawad Al-Kulabi
Publikováno v:
Journal La Lifesci. 3:1-13
Since the United Nations General Assembly passed two resolutions in December 1974, the term "desertification" has become a part of international development discourse: The first is a call to all countries to pay attention to desertification research
Publikováno v:
Open Engineering. 12:702-715
In the construction industry, time overrun in construction projects has become a global phenomenon. In Iraq, this problem is very considerable where a high percentage of projects are completed behind schedule, causing a large negative impact on socie
Publikováno v:
Open Engineering. 12:111-119
Three scaled concrete slabs were cast and tested till failure under drop-weight impacts and static loads, sequentially. Two of the three slabs contained 0.5% steel fiber while the third slab was constructed by using only steel bar reinforcement (i.e.
Publikováno v:
International Journal of Psychosocial Rehabilitation. 24:888-898
Publikováno v:
Journal of Perioperative Practice
This literature review aims to provide an account of the changes to orthopaedics in the era of COVID-19. Herein, the authors explored the use of telemedicine in orthopaedics as well as changes in surgical protocols, screening methods, work priorities