Zobrazeno 1 - 10
of 14
pro vyhledávání: '"Agus Indarto"'
Autor:
Wahyudi Budi Pramono, Fransisco Danang Wijaya, Sasongko Pramono Hadi, Agus Indarto, Moh Slamet Wahyudi
Publikováno v:
International Journal of Technology, Vol 15, Iss 5, Pp 1550-1560 (2024)
The operation of power transformer in an electric system is the cause of noise in form of sound. At a certain level, this noise can be considered as pollution, interfering with the comfort and health of human hearing. The phenomenon shows the need to
Externí odkaz:
https://doaj.org/article/4ee45225cd1e4b3083593079a3999564
Autor:
Wahyudi Budi Pramono, Fransisco Danang Wijaya, Sasongko Pramono Hadi, Moh. Slamet Wahyudi, Agus Indarto
Publikováno v:
Designs, Vol 7, Iss 1, p 31 (2023)
The increased use of electrical energy will encourage the installation of more power transformers in residential areas as well as in industrial areas. Each power transformer, in its operation, will generate noise that can interfere with comfort and,
Externí odkaz:
https://doaj.org/article/77e643de67d447c8a7ffe6a0d039ef9e
Publikováno v:
Jurnal Teknik Pengairan, Vol 3, Iss 2, Pp 174-184 (2013)
MHP Brumbung is located at upstream of Srinjing River. Potential discharge MHP Brumbung depends on the discharge of the gate 1 operation of Siman dam which is used to irrigate 4852 Ha Siman crop area. To obtain the optimal scale in the construction
Externí odkaz:
https://doaj.org/article/2392ddb7a0074835ada596df5693de05
Autor:
Agus Indarto, Moh Abduh
Publikováno v:
Seminar Keinsinyuran Program Studi Program Profesi Insinyur. 3
Studi kasus dalam penelitian ini adalah Bendung Cerme. Bendung Cerme terletak di Desa Cerme Kecamatan Grogol Kabupaten Kediri, mengairi areal irigasi seluas 182 ha. Bendung Cerme direncanakan dengan tipe bendung tetap dan tipe mercu bulat dengan satu
Publikováno v:
International Journal of Smart Grid and Clean Energy. :191-202
Autor:
Iwa Garniwa, Faiz Husnayain, Agus Indarto, Amien Rahardjo, Ardhyan Wisnu Murti, Chairul Hudaya
Publikováno v:
IEEE Transactions on Dielectrics and Electrical Insulation. 27:964-970
In this study, 238 power transformers (PTs) with operating voltages between 150500 kV and capacities in the range of 60–167 MVA are tested for partial discharge (PD). Thirty-eight of the PTs exceeded the pre-determined value of 70 pC at 1.5 maxim
Autor:
Wahyudi Budi Pramono, F. Danang Wijaya, Sasongko Pramono Hadi, Agus Indarto, Mohammad Slamet Wahyudi
Publikováno v:
2021 8th International Conference on Information Technology, Computer and Electrical Engineering (ICITACEE).
Publikováno v:
2019 IEEE 2nd International Conference on Power and Energy Applications (ICPEA).
Manufacturing process of oil immersed Power Transformer (PT) has significant effect to the value of its partial discharge (PD). PD is one of the most important parameters of PT to ensures the reliability and quality of the PT's operation PT. As PT is
Publikováno v:
IOP Conference Series: Earth and Environmental Science. 673:012008
Power transformer has an important role in a transmission system. One factor that can reduce efficiency in the transmission system is transmission losses. Efficiency can be increased by reducing losses in the power transformer. The biggest influence
Publikováno v:
IOP Conference Series: Materials Science and Engineering. 909:012019
The grid-connected Photovoltaic (PV) System was installed in the rooftop of Energi Building, PUSPIPTEK in 2017 located in Serpong, South Tangerang. The System consists of 40 modules @265 Wp, a 10 kWh battery system, and a 10250 kW grid-tie inverter.