Zobrazeno 1 - 10
of 15
pro vyhledávání: '"Agung Sutarto"'
Autor:
Muhammad Faizal Ardhiansyah Arifin, Yoga Aditya, Agung Budiwirawan, Agung Sutarto, Arie Taveriyanto
Publikováno v:
Jurnal Teknik Sipil dan Perencanaan, Vol 24, Iss 1, Pp 72-80 (2022)
Abstract. Buildings with component degradation are a common challenge for all construction companies across the world. There are various building's components that it is challenging for construction companies to manage them all at once. It was not co
Externí odkaz:
https://doaj.org/article/fab70a827292456c8b40ae24cd3fb59d
Publikováno v:
Jurnal Teknik Sipil dan Perencanaan, Vol 19, Iss 1, Pp 71-76 (2017)
Brebes is one of the districts traversed by the road north coast. Congestion on roads pantura frequent because this road is a national road along the coast of the island of Java. Long road pantura Brebes 32.8 Km. The purpose of this study was to eval
Externí odkaz:
https://doaj.org/article/0d995a5eb2104d49a281d14fba7589fa
Autor:
Agung Sutarto
Publikováno v:
Jurnal Teknik Sipil dan Perencanaan, Vol 17, Iss 1, Pp 43-50 (2015)
Bukit Semarang Baru Housing Mijen is one of the housing on the outskirts of the city of Semarang that most of the population works in the city, resulting in the overload trip generation pathways roads leading to the city center of Semarang. Hence it
Externí odkaz:
https://doaj.org/article/1d5e6ab9a31a4d629bfd544c2e27ba2c
Autor:
Agung Sutarto
Publikováno v:
Sainteknol, Vol 10, Iss 2, Pp - (2012)
Sebagai Kampus Konservasi, Universitas Negeri Semarang (Unnes) akan menerapkan kebijakan transportasi internal yaitu pergerakan pengguna dengan berjalan kaki atau bersepeda menuju gedung kampus. Fasilitas pejalan kaki ini dipandang masih belum memenu
Externí odkaz:
https://doaj.org/article/6617ce2cbbce4960b19ec44ff67ac217
Autor:
Agung Sutarto, Kharismawan Irfan Fauzy
Publikováno v:
Citizen : Jurnal Ilmiah Multidisiplin Indonesia. 3:70-76
In the planning of construction work, various things can happen in the implementation of construction projects which can cause an increase in implementation time so that the completion of the project becomes late. Delays in project work can be antici
Publikováno v:
Citizen : Jurnal Ilmiah Multidisiplin Indonesia. 3:11-21
The Budget Plan is an important process in project planning as it forms the basis for making a price offer and estimation framework that will be used in tendering. It aims to consider the cost involved during the project implementation. The aim of th
Autor:
Shanty Andriani Novita, Agung Sutarto
Publikováno v:
Citizen : Jurnal Ilmiah Multidisiplin Indonesia. 2:444-452
Looking at the total level of rapid development of construction work, which is relatively fast, it becomes a challenge for the construction world. This is followed by the development of a very diverse method of various construction implementations ap
Publikováno v:
Citizen : Jurnal Ilmiah Multidisiplin Indonesia. 2:71-80
One of the obstacles when working on a construction site is industrial accidents. This is evidenced by the number of accidents at work in 2020. The number increased from 85,109 at the beginning of 2020 to 108,573. This study aims to define implementi
Publikováno v:
INERSIA lnformasi dan Ekspose Hasil Riset Teknik Sipil dan Arsitektur. 17:83-95
One type of deep foundation is a pile foundation that is designed and has the ability to withstand axial, lateral, and uplift loads. This analysis aims to determine and compare deflections that occur on poles that are in granular soil by using the ma
Publikováno v:
Jurnal Teknik Sipil, Vol 9, Iss 1, Pp 40-46 (2020)
Bangunan Pengendali Sedimen Sabo dam bangunan Gendol Check Dam -13 (GE-C13) merupakan salah satu bangunan yang mengalami kerusakan akibat erupsi merapi pada tahun 2010 dan pada tahun 2018 bangunan pengendali sedimen GE-C13 telah selesai di perbaiki k