Zobrazeno 1 - 9
of 9
pro vyhledávání: '"Adel Eldosouky"'
Publikováno v:
Journal of Engineering Research - Egypt, Vol 7, Iss Issue 2, Pp 195-203 (2023)
Inadequate lighting plans for the operations performed at night on construction sites can affect the quality of the implemented work, labor productivity, safety, as well as the project's overall cost. Accordingly, to avoid inadequate lighting conditi
Externí odkaz:
https://doaj.org/article/ba8c33b47b6c493b89e3d281b1873248
Publikováno v:
Journal of Engineering Research - Egypt, Vol 6, Iss 2, Pp 29-39 (2022)
Precisely drafting the infrastructure construction contract is a way to ensure the success and continuity of the project without any complications, and through which the rights and duties of each party involved in the project are determined. Internat
Externí odkaz:
https://doaj.org/article/65b4e11a12e941a8a9880f5b40337936
Publikováno v:
Journal of Engineering Research - Egypt, Vol 5, Iss 3, Pp 8-16 (2021)
The mediation process is the parties' will to the dispute to reach an amicable, non-binding settlement to end their dispute. The Egyptian legislature adopted the idea of issuing a draft law on mediation in civil and commercial matters to settle dispu
Externí odkaz:
https://doaj.org/article/6308fd2b766b4499bcc9758bcd497901
Publikováno v:
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 14
There is a growing demand for arbitration as a method of settling disputes in engineering cases. This study’s primary advantage is to contrast British and Egyptian arbitration proceedings i...
Publikováno v:
Alexandria Engineering Journal, Vol 53, Iss 4, Pp 863-881 (2014)
Many contractors are of the opinion that adding contingency funds to the tender price of a project may lead to loss of the tender. This research is a trial to put an end to this incorrect opinion. A more mature attitude to risk would recognize that c
Publikováno v:
Journal of Construction Engineering and Management. 130:534-541
The layout of a construction site plays a major role in the safety and productivity of operations, particularly when site space is restricted. As construction evolves, however, the site layout may need to be dynamically reorganized at various schedul
Publikováno v:
Construction Management and Economics. 19:689-697
The appropriate layout of temporary facilities on a construction site has a large impact on construction safety and productivity. For the duration of a project the site layout may need to be efficiently re-organized at various intervals to satisfy th
Publikováno v:
Journal of Construction Engineering & Management; Jul/Aug2004, Vol. 130 Issue 4, p534-541, 8p
Publikováno v:
Alexandria Engineering Journal, Vol 53, Iss 4, Pp 863-881 (2014)
Many contractors are of the opinion that adding contingency funds to the tender price of a project may lead to loss of the tender. This research is a trial to put an end to this incorrect opinion. A more mature attitude to risk would recognize that c
Externí odkaz:
https://doaj.org/article/5f760c13480e446297a5b680f66396b4