Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Aart Van Kranenburg"'
Autor:
Aart Van Kranenburg, Caroline Combe, Knut Nedregotten Hals, Brian Phillip Champion, Dave Elliott
Publikováno v:
All Days.
The big-bore, high flowrate completion design used on Ormen Lange features a high-set production packer and large bore 9 5/8" production liner. This completion design makes it impractical to install a traditional cabled Permanent Downhole Gauge (PDG)
Publikováno v:
All Days.
Ormen Lange is the second-largest gas field in Norway, currently providing 20% of the domestic gas consumption for the UK. As one of the world's largest subsea big-bore gas wells - with production rates up to 350 MMscf/d per well, a 120-km tieback to
Autor:
Jean Twycross, Ian Donald McKay, Stephen R. Vickers, Aart Van Kranenburg, Alistair Paul Hutton, Arne Lund
Publikováno v:
All Days.
The challenges in developing the Ormen Lange field were the harsh weather conditions, deep-water depth, subsea topography and sub-zero seabed temperatures. Due to environmental constraints and the selected sand face completion type, a water-based flu
Autor:
Jan Hendrik Terwogt, Aart Van Kranenburg, N.S. Hadfield, Kimberly Ann King, Sharifudin Salahudin
Publikováno v:
Offshore Technology Conference.
Summary The Shallow Clastics field operated by Sarawak Shell primarily targets two shallow gas-bearing reservoirs, H1 and H2, at approximately 2,650 ft true vertical depth (TVD). An appraisal, early-producer well was drilled with a deviated wellbore