Zobrazeno 1 - 4
of 4
pro vyhledávání: '"ANC-02604"'
Autor:
Phyllys Callina
This probability analysis report includes the addition of all cultural resource sites added to the Alaska Heritage Resources Survey (AHRS) and all cultural resource surveys conducted on Joint Base Elmendorf-Richardson (JBER) and reported on between O
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::0f9a4b812a51cf5ae713f8250c6f147a
Autor:
Phyllys Callina
This cultural resource and probability analysis report includes the addition of all cultural resource sites added to the Alaska Heritage Resources Survey (AHRS) and all cultural resource surveys conducted on Joint Base Elmendorf-Richardson (JBER) and
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::02133312b9619ca6415e1dad3189bafc
Autor:
Gaines, Edmund P.
Joint Base Elmendorf-Richardson (JBER) had proposed to conduct watershed and fishery enhancement activities in the Otter Creek and Six mile Creek watersheds within the boundaries of the installation. The U.S. Army Corps of Engineers (USACE), on behal
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::514242252ffdd29fae2256b0aaa42945
Autor:
Gaines, Edmund P.
Joint Base Elmendorf-Richardson (JBER) has proposed to construct two new demolition ranges—Demolition Range “A” and Demolition Range “B”—at the Richardson Training Area (RTA), with new access roads proposed at each range. During the perio
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::67c8b0d31cf9702e43eb280567a7c988