Zobrazeno 1 - 10
of 65
pro vyhledávání: '"A. Shinotake"'
Publikováno v:
The Proceedings of Conference of Kanto Branch. :11D14
Autor:
Taito Shiono, Akihiko Shinotake
Publikováno v:
The Proceedings of Ibaraki District Conference. :305
Publikováno v:
International Journal of Thermophysics. 35:1320-1329
As the initial process in an integrated steel-making plant, molten iron is produced in a blast furnace. The molten iron has a temperature between 1700 K and 1900 K. The outflow stream discharged from a taphole comprises the molten iron and slag (whic
Autor:
Akihiko Shinotake
Publikováno v:
ISIJ International. 54:1546-1551
Autor:
Akihiko Shinotake, Masaaki Naito, Zen-Etsu Kikuchi, Jun Tsubota, Omatsu Yasuhiko, Hiroyuki Suzuki, Akagi Kazushi, Shin Murase
Publikováno v:
Tetsu-to-Hagane. 99:185-190
Autor:
Kazuya Kunitomo, Hiroyuki Tanaka, Misao Hashimoto, Akihiko Shinotake, Shinroku Matsuzaki, Toshihiro Nagane, Kanetada Nagamine, Asao Hatanaka, Masaaki Naito
Publikováno v:
Tetsu-to-Hagane. 95:665-671
The visualization of the inner state of a blast furnace was investigated by exploiting the feature of cosmic-ray muon that attenuates according to the density and the thickness of the object through which it penetrates. The distribution of the cosmic
Autor:
Asao Hatanaka, Masaaki Naito, Akihiko Shinotake, Hiroyuki Tanaka, Kanetada Nagamine, Satoshi Nakamura, Katsuhiko Ishida, Misao Hashimoto
Publikováno v:
Proceedings of the Japan Academy, Series B. 81:257-260
By using the detection system of the near-horizontal cosmic-ray radiography originally developed for probing inner structure of volcanic mountains, a measurement was conducted to probe the inner structure and its time-dependent change of the blast fu
Publikováno v:
Revue de Métallurgie. 101:203-209
The effect of blast furnace productivity on the erosion of the hearth wall and the campaign life was examined. First, the molten iron flow in the hearth was studied by a model experiment and an iron flow estimation model calculation. Next, the temper
Publikováno v:
ISIJ International. 43:321-330
The sidewall core boring of the Tobata No. 1 BF, which had been blown out in 1998, was carried out. Bricks and residue in the hearth were sampled and investigated in order to estimate the erosion and protection mechanism of the hearth sidewall. Sampl