Zobrazeno 1 - 10
of 37
pro vyhledávání: '"A., Neelakanteswara Rao"'
Publikováno v:
Journal of Modelling in Management, 2021, Vol. 18, Issue 1, pp. 17-35.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/JM2-06-2020-0168
Publikováno v:
International Journal of Mathematical, Engineering and Management Sciences, Vol 7, Iss 6, Pp 791-819 (2022)
Micro- Small and Medium Enterprises (MSMEs) are very significant for a country’s economy due to their contribution to manufacturing, sales and Gross Domestic Product (GDP) growth. The global market competition and standards have been compelling MSM
Externí odkaz:
https://doaj.org/article/636face2b56340a88e9fbb9f5cff0e36
Publikováno v:
International Journal of Lean Six Sigma, 2020, Vol. 12, Issue 3, pp. 503-535.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/IJLSS-09-2019-0100
Publikováno v:
Journal of Modelling in Management. 18:17-35
Purpose Pull production systems have received much attention in the supply chain management environment. The number of Kanbans is a key decision variable in the pull production system as it affects the finished goods inventory (FGI) and backorders of
Autor:
Konka Shruti, Sabareesh Geetha Rajasekharan, Shanbhag Rahul Govindray, Paturu Neelakanteswara Rao
Publikováno v:
Journal of The Institution of Engineers (India): Series A. 102:403-409
Wind load acting on a building in presence of one or more interfering buildings usually varies when compared to isolated buildings. This effect of variations in wind loads due to presence of other interfering building is termed interference effect. T
Publikováno v:
International Journal of Lean Six Sigma. 12:503-535
Purpose The paper aims to analyse the contextual relationship and dependency amongst enablers for lean manufacturing implementation in Bulgarian small and medium-sized enterprises (SMEs). Design/methodology/approach In this study, the interpretive st
Publikováno v:
Materials Today: Proceedings. 33:142-146
Each manufacturing industry has tried to improve their profits through effective operational strategies and policies. Hence, continuous performance measurement is required due to the abnormal variations in the customer demand and production processes
Publikováno v:
Procedia Manufacturing. 30:40-47
In today’s fierce global environment, continuous performance measurement is the key mantra for any kind of business successes. The performance measurement system is a framework to measure the efficiency of the supply chain. The purpose of this pape
Publikováno v:
Procedia Manufacturing. 30:34-39
In this paper, the development of dynamic job shop scheduling problem was summarized broadly. It discusses the concept of dynamic job shop scheduling, dynamic events, evaluation indicator, dynamic scheduling strategy, dynamic scheduling methods, and
Publikováno v:
International Journal of Productivity and Performance Management. 67:318-340
Purpose The purpose of this paper is to test the supply chain (SC) strategies and the linking of SCs to SC strategies in line with Lee’s (2002) model. Design/methodology/approach The paper used an empirical survey of 134 large industries to test th