Zobrazeno 1 - 3
of 3
pro vyhledávání: '"26NY1452"'
Autor:
Hatzenbuehler, Lynn
Lockheed Martin proposes development of a borrow pit, grading and graveling of an existing jeep trail, and grading for a TPK pad. Because the entire project area is currently accessible through existing roadways, the APE is defined as the project are
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::2b382f308522d00dfded90d7374cae17
Autor:
Pippin, Lonnie C.
The Desert Research Institute (DRI) was tasked to conduct cultural resources reconnaissances of the proposed project area. The area of potential effect (APE), approximately 1.5 hectares, was inspected for cultural resources by parallel, pedestrian tr
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::9a5a68c6c0f3006d9cd8518ec6f3e75c
Autor:
Pippin, Lonnie C., Drollinger, Harold
The U.S. Air Force proposes to construct a 60 x 60 m (200 x 200 ft) facility pad, designated TPK-38, on the Tolicha Peak Electronic Combat Range (TPECR) to house the existing S13 radar unit now located at TPK-6 (Figure 1). The moving of this unit is
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::604551311bf12f9d6888efeff7a596a2