Zobrazeno 1 - 5
of 5
pro vyhledávání: '"陳啟正"'
Autor:
Chi-Jeng Chen, 陳啟正
97
Due to the increasing growth of air transportation demand, the Aircraft Landing Problem (ALP), which deals with the arrangement of landing time and sequence of a set of aircrafts to be landed at the airport, becomes an important issue for air
Due to the increasing growth of air transportation demand, the Aircraft Landing Problem (ALP), which deals with the arrangement of landing time and sequence of a set of aircrafts to be landed at the airport, becomes an important issue for air
Externí odkaz:
http://ndltd.ncl.edu.tw/handle/14011460315631241424
Autor:
Chi-cheng chen, 陳啟正
96
The eye patterns of the Art Deco in the Shang Dynasty were divided into two types: the common round shape (or oval-shaped design) and the icon-shaped type, such as “臣” and “目”, both of which are quite similar to the Oracle-bone in
The eye patterns of the Art Deco in the Shang Dynasty were divided into two types: the common round shape (or oval-shaped design) and the icon-shaped type, such as “臣” and “目”, both of which are quite similar to the Oracle-bone in
Externí odkaz:
http://ndltd.ncl.edu.tw/handle/44891997642386973969
Autor:
Chi-Cheng Chen, 陳啟正
93
Swden, Norway, Denmark implemented Social Democracy and kept stable party system in the 30’s of the 20th century. After 1930’s, Social Democratic Party held the reins of government, maintained their predominance and expanded the unique mo
Swden, Norway, Denmark implemented Social Democracy and kept stable party system in the 30’s of the 20th century. After 1930’s, Social Democratic Party held the reins of government, maintained their predominance and expanded the unique mo
Externí odkaz:
http://ndltd.ncl.edu.tw/handle/98586920505501239630
Autor:
Chi-Jeng Chen, 陳啟正
92
The river flood control project is frequently caused by the support shortage of government financial to finally result in edge-out efficiency with the consequent engineering delay. Also, affected by the land owners’ violent resistance due t
The river flood control project is frequently caused by the support shortage of government financial to finally result in edge-out efficiency with the consequent engineering delay. Also, affected by the land owners’ violent resistance due t
Externí odkaz:
http://ndltd.ncl.edu.tw/handle/00068927262748965411