Zobrazeno 1 - 10
of 15
pro vyhledávání: '"İsmail Serdar Bakal"'
Publikováno v:
Computers & Industrial Engineering. 129:239-250
In this study, we consider the joint problem of preventive replacement and spare parts inventory planning. We present an exact dynamic programming formulation to minimize the total expected cost over a finite planning horizon. As it is not possible t
The mining industry should sustain mass and continuous production with an essential contribution of high-capacity machinery. Therefore, spare parts inventory management is vital in ensuring the intended mining production rate as an integral part of m
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::d0890c0b3fbfef3cf85c8c556ba07155
https://hdl.handle.net/11511/88926
https://hdl.handle.net/11511/88926
Publikováno v:
Volume: 28, Issue: 1 128-138
Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi
Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi
Spare parts inventory management is of vital importance in maintaining high equipment availability at minimum cost, especially for industries utilizing fully mechanized systems and aiming mass and continuous production such as mining. In this paper,
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::192d993b151755d84fecc646d7ae6242
https://dergipark.org.tr/tr/pub/pajes/issue/68582/1079512
https://dergipark.org.tr/tr/pub/pajes/issue/68582/1079512
Publikováno v:
European Journal of Operational Research. 263:446-460
We consider an infinite horizon, continuous review inventory model with deterministic stationary demand where supply is subject to disruption. The supply process alternates between two states randomly: one in which it functions normally (ON-period) a
Autor:
Ismail Serdar Bakal, Hüseyin Köle
Publikováno v:
Computers & Industrial Engineering. 103:85-97
We model the replenishment strategy of a dual-sourcing buyer under disruption risk.We examine the benefits of an options contract with a reliable supplier.We consider three levels of information regarding the timing of option-exercise.We analytically
Publikováno v:
International Journal of Production Economics. 143:294-303
We consider a manufacturing system with stochastic demand and predictable production yield. The manufacturer has predetermined prices and limited production capacity in each period. The manufacturer also has the option to save some inventory for futu
Publikováno v:
International Journal of Production Economics. 143:222-232
In this study, we focus on pricing and production decisions in utilizing reusable containers with stochastic customer demand. We consider a manufacturer that sells a single product to the customers in reusable containers with two supply options: (i)
Autor:
Ismail Serdar Bakal, Selçuk Karakaya
Publikováno v:
Computers & Industrial Engineering. 64:696-707
In this study, we analyze a decentralized supply chain with a single retailer and a single manufacturer where the retailer sells multiple products in a single period. The products differ in terms of a limited number of features only. The retailer pla
Autor:
Joseph Geunes, Ismail Serdar Bakal
Publikováno v:
International Journal of Production Research. 48:2395-2412
The timing of retailer order placement is an important factor in supply chain performance in systems with uncertain end-customer demands. Retailers often prefer short order lead times, which permits the resolution of demand uncertainty prior to order