Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Richard Andrews"'
Autor:
Selective Amygdalohippocampectomy, Alastair T Hoyt, Kareem A. Zaghloul, Technical Approaches, Robert E. Gross, Saurabh Sinha, Richard Andrews, Arun Angelo Patil, Shabbar F. Danish, Edward F. Chang, Jon T. Willie, Andrea J Chamczuk, Drane, Kris A Smith
Publikováno v:
Neurosurgery Clinics of North America. 27:vii-x
Autor:
Richard Andrews, V. Scarpine, Lionel Prost, R. D'Arcy, C. Wiesner, A. Chen, Jean-Paul Carneiro, Alexander Shemyakin, B. Hanna, M. Alvarez
Publikováno v:
AIP Conference Proceedings.
The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design
Autor:
Usha Agarwal-Hollands, Richard Andrews
Publikováno v:
Education, Communication & Information. 1:59-73
The aim of this paper is to examine the use of the scroll metaphor in the electronic context and to explore new ways of using computing capabilities to convert this extremely basic linear narrative device into an effective navigation tool. At the sam
Autor:
Keith M. Goldstein, Joseph E. Fuhr, Daniel P. Kestler, Richard Andrews, Sujata Agarwal, Robert E. Hall
Publikováno v:
American Journal of Hematology. 61:169-177
We have previously identified and cloned an alternatively spliced form of human interleukin-6 mRNA lacking exon II, which encodes amino acid residues known to be important in gp130-mediated signal transduction pathways. We expressed and purified the
Autor:
Wendy Morgan, Richard Andrews
Publikováno v:
Changing English. 6:81-92
Publikováno v:
Proceedings of the 10th Pacific Structural Steel Conference (PSSC 2013).
Autor:
M. Martin, T. Lincicome, C. H. Rode, R. Ferry, J. C. Gannon, Richard Andrews, J. Satti, Jerry Makara, D. Mizicko, J. Theilacker, T. Peterson, J. Misek
Publikováno v:
Advances in Cryogenic Engineering ISBN: 9781461398677
Completetion of the new Fermilab 6 km circumference superconducting proton accelerator, the Tevatron, was in the summer of 1983. During the commissioning of portions of the accelerator, extensive refrigerator and magnet power testing have been perfor
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::c24f3409984545d80b7702245df4158e
https://doi.org/10.1007/978-1-4613-9865-3_49
https://doi.org/10.1007/978-1-4613-9865-3_49